Displayed below, are early three dimensional presentations presented to the major stake holders within the manufacturing community. Weekly presentations, allowed diverse input in the design. Daylighting, light studies, ductwork were all visualized and then analyzed for spatial and engineering conformance. With BAG’s 3D graphics and early BIM skills, stakeholders realized their dreams early confirming their concepts were being integrated into the design. They all became a part of the design process.
With these studies, room concepts, colors of building materials as well as master planning additions were fully visualized. |